Putting the system into production. To do this well it’s essential to look at the complete end to end workflow - it should be possible to see the Epic screens and understand how the users interact with them and how the data flows through into your application.
Performance Testing
Is the overall system able to handle the volume of data coming through the interface?
This involves trying out the system and seeing what the bottlenecks are in its performance.
HIPAA Audit
We need to make sure that the implementation and set up complies with HIPAA regulations.
Reliability Analysis
What are the most likely operational failure points in the system and for each point what is the mitigation measure?
i.e. what happens if the virtual machine Iguana is running on fails.